A curated record of projects completed across the Group — spanning ground-up development, structural refurbishment, decorative works, and long-term building stewardship throughout the United Kingdom.
Scroll
01
Prestige Renovations
Caldecotte Lake Residential Development, Milton Keynes
Scope63 Apartments · Design & Build · Full Fit-Out
ValueConfidential
Year2024–2025
A multi-phased residential conversion project delivering 63 self-contained apartments across two buildings at Caldecotte Lake Business Park. Prestige Renovations served as principal contractor, overseeing structural works, full MEP installation, external envelope upgrades including EWI and brick slip cladding, and complete interior fit-out to building regulations and funder specification. The project required extensive coordination with funders, monitoring surveyors, and statutory authorities throughout an 18-month delivery programme.
Structural Conversion
MEP Installation
EWI & Cladding
Interior Fit-Out
Principal Contractor
Funder Reporting
02
Prime Decorating
Belgravia Apartment Heritage Paint & Gilding
LocationBelgravia, London SW1
Year2024
Full redecoration of a six-bedroom lateral apartment in Belgravia, specified to heritage standard throughout. Works included specialist limewash application, hand-applied gold leaf gilding to cornices and joinery, and period-appropriate paint finishes sourced exclusively from Farrow & Ball and Little Greene heritage ranges.
Heritage Limewash
Gold Leaf Gilding
Period Joinery Finishing
03
Supreme Construction
City Office Block Full M&E Retrofit
LocationCity of London EC2
Year2024
Complete mechanical and electrical retrofit of a 14-storey commercial office building occupied throughout the programme. Works included full LV distribution upgrade, air handling unit replacement, BMS installation, and a phased lighting strategy delivered over 11 months with zero tenant disruption.
LV Distribution
AHU Replacement
BMS
Occupied Premises
04
Prestige Renovations
Kensington Townhouse Whole-House Refurbishment
Year2023
End-to-end refurbishment of a seven-bedroom stucco-fronted townhouse, retaining all original period features while introducing contemporary servicing, underfloor heating, and a new basement entertainment suite.
Period Retention
Basement Extension
UFH
05
Prime Decorating
Chelsea Studio Specialist Plaster Finishes
Year2023
Applied tadelakt plaster throughout wet rooms and a feature wall in a bespoke Chelsea studio. The project required multiple sample rounds with the client's interior architect before agreeing the final texture and tone.
Tadelakt
Polished Plaster
Sample Process
06
Supreme Construction
Mayfair Mansion Block PPM Contract, 3 Years
Year2022–Ongoing
Planned preventive maintenance and reactive building services across 48 residential units and common parts. Supreme Construction holds a rolling three-year PPM contract covering all mechanical, electrical, and fabric obligations for the freeholder.
PPM Contract
Reactive Call-Out
Freeholder Service
07
Prestige Renovations
Surrey New Build Design & Build, Detached Residence
LocationGuildford, Surrey
ScopeGround Up · 6 Bed · Pool & Annexe
Year2022
Complete design and build of a six-bedroom detached residence with associated pool building, ancillary annexe, and 1.2-acre landscaped grounds. Prestige managed the full design team — architect, structural engineer, landscape architect — and delivered the project under a JCT Design & Build contract, on programme and within budget.